
New TopShim run:

version = topshim 2.0.0
date = 2022-05-27
time = 17:34:20.590
command = topshim 

FINE SHIMMING

Parameters:

probe = Z108618_1022
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 1.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.5 Hz, After= 0.7 Hz
Iteration  3: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.5 Hz
Iteration  4: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  5: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.626

shim changes: 
Z	-43
Z2	-229
Z3	+117
Z4	-13
Z5	-865
Z6	-2220

duration = 1 min 40 sec
completed successfully
finished Fri May 27 17:35:59 2022


========================================================================
